The project worth $ 200 million Firtash was deprived of an attractive deposit – what’s next?

Date:

Dmitry Firtash, Motronovsky GOC, lost a license to develop a zircon-Rutil-Ilmenitovo Malyshevsk deposit. The asset can now auction or offer a product distribution agreement (PSA). Is it interesting business?

The Conlint concerns the Motro-Anane plot, located in the northwestern part of the Malyshevsk deposit. It is now being developed by the Free Mountain MMC of the United Mining and Chemical Company (OGHK). There is little known about the site – the main stocks are classified, only about the deposits of related materials. For example, distinct-syllimanitis here is 1407.8 thousand tons, Stavrolite-567.9 thousand tons. The area of ​​the plot, which is located in the Kirovograd and Dnipropetrovsk regions, is 3309.8 ha.

Share post:

Popular

More like this
Related

Ukrainians will celebrate the Day of Remembrance and Victory over Nazism together with Europe

The President submitted to the Verkhovna Rada of Ukraine...

Special screenings of the film “Pamphyr” are being held in the capital: features of the picture

This week, a tape was released that showed the...

A Kyiv high-rise building installed solar panels on the roof: what will it do?

Installing solar panels on the roof is a backup...

Formula 1: Andretti’s string of proposals reflects the tumultuous relationship between F1 intermediaries

A storm is brewing in Formula 1. At first glance,...