Stabilizing blackouts are used in four districts of Kyiv — DTEK

Date:

Due to damage after a missile strike, networks cannot transmit electricity and overload occurs.

In part of the Holosiivskyi, Sviatoshynskyi, Shevchenkivskyi and Solomyanskyi districts, disconnections are taking place in accordance with the stabilization schedules. About this informs company DTEK Kyiv Electric Networks.

“Due to the damage to the power system, energy facilities cannot transmit the energy that is currently necessary for all residents of these areas, and the power grids are overloaded,” the energy experts explained.

According to the command of the dispatcher of NEC Ukrenergo, disconnections are currently applied to these areas according to the schedules posted on the website of DTEK Kyiv Electric Grids.

Stay tuned for updated information on our official resources.

There are currently no limits from NEC “Ukrenergo”.

Share post:

Popular

More like this
Related

Oblenergo in 2024 performed routine repairs in full – State Energy Squad

The operators of the distribution system (OSR, Oblenergo) on...

The US should strengthen control over Russian oil supplies, the White House says

The United States should accelerate the process of strengthening...